Baseline-systems BHM Series Hydrometer Manual de usuario Pagina 15

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 52
  • Tabla de contenidos
  • SOLUCIÓN DE PROBLEMAS
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 14
Hydrometers Operation and Maintenance Manual15
Drainage Valve
DRAINAGE VALVE
At the beginning of the winter it is necessary to drain the water from the pipeline in order to
prevent the pipes from bursting. (Please refer to the drawing below)
Before draining, it is very important to ensure that there is no pressure in the line.
Dissassemble plug (1)
Assemble the drainage ball valve (2)
Assemble elbow (3)
CAUTION: Do not use compressed air to blow out hydrometer.
Vista de pagina 14
1 2 ... 10 11 12 13 14 15 16 17 18 19 20 ... 51 52

Comentarios a estos manuales

Sin comentarios